Building Permit Forms |
Description |
|
application to apply for a building permit |
|
permit application for manufacture home installation |
|
to be completed prior to placing a second hand mobile home in Flagler County |
|
application for a building permit to construct a temporary sign per Section 7.04.04 of the Flagler County Land Development Code |
|
document must be executed and recorded for all permits with value of $2,500 or more |
|
notarized statement that the Notice of Commencement has been filed for recording accompanied by a copy of the Notice of Commencement |
|
document must be executed for the owner of a property to pull a building permit acting as their own contractor (owner/builder) |
|
document to be executed when a tenant in a building is applying for building permit for a property |
|
notarized document by homeowner stating the structure on the property will not cause drainage problems |
| Existing Culvert or Driveway |
to be used instead of Right of Way permit application if a culvert or driveway already exists on property |
| Certificate of No Protected Tree |
to be submitted with application for New Residential Structure |
| Certificate of No Tree Removal |
to be submitted with application for all Building Permits other than New Residential Structure |
| Flagler County Tree Compliance |
guidelines for Tree Compliance |
|
summarization of the Mechanics Lien Law |
| Instructions for Hold Harmless Agreement |
for construction encroaching into an easement |
| Hold Harmless Agreement |
to be signed when construction encroaches into an easement |
|
document to be executed when applying for a pool permit to install either a pool, spa, or hot tub |
|
requests electric power for checking out equipment prior to final inspection |
| Revision Request |
form to submit to Building dept. |
|
application to obtain copies or information on historical building permits |
| Permit Requirements |
requirements for residence, residential addition, mobile home, lighting standards for future development, commercial permit, construction trailer, office or sales trailer, sign, tent, tower, commercial swimming pool, swimming pool, above ground pool, fence, pole barn, shed, re-roof, electrical, demolition, seawall/dock/boathouse, storm shutters, interior/exterior renovations, window/door replacement, temporary sign, political signs |
| Permit Application Flow Chart |
flow chart and description walking you through the permitting process |
| Minimum Drawing Requirements |
for residences, additions and accessory structures |
| Roofing Information Sheet |
FBC requirements, general and specific requirements, re-roofing, homeowner inspection |
|
application for a Right-Of-Way utilization permit |
|
application for a product approval |